Rabu, 23 Juli 2008

Education

1997 – 2002
Gadjah Mada University (UGM) Yogyakarta
Bachelor Degree (S1) in Chemical Engineering, GPA: 3.42 (scale: 4)

Study Project : Design of Ethylene Oxide Plant from Ethylene and Oxygen (Annual Capacity 120,000 tons/year)

Research : Precipitation Cr 3+ from Leather Tanning Waste with Lime

Training

· Health, Safety & Environment Training – Trained by CNOOC SES Ltd.
· TKDN (Local Content) Seminar – MIGAS
· Basic Sea Survival Training – Trained by PT Samson Tiara.
· ASME Training – Trained by Lloyd Register
· Visual Examination Training – Trained by PT Grand Kartech
· Boiler and Pressure Vessel Traning – Trained by PT Grand Kartech
- Mechanical Design of Boiler and Pressure Vessel
- Boiler and Pressure Vessel Instrumentation
- Boiler Package and System
· Welding Procedure Specification Training – Trained by PT Grand Kartech

References

· Budiyento Thomas – Senior Manager Gas Project Development and Marketing – CNOOC SES ltd
· Ma Zhongping – Project Manager Gas Project Development and Marketing – CNOOC SES ltd
· Wang Fu – Senior Head of Project Control and Pipeline Engineer – CNOOC SES ltd
· Zhu Xiaochun – Senior Head of Project Control – CNOOC SES ltd

Summary Professional Experience and Qualification

More than five years experiences in Project Planning and Controlling (Project Management for Planning/Scheduling and Costing) for Oil and Gas Industry.

Experience gained over the years includes:
· Project control services (coordinate planning/schedulling, cost control services and resource planning).
· Project scheduling with the right of sequences and network; using Primavera or Microsoft Project package.
· Project analysis and forecasting (analysis the project schedule and costing trends)
· Project updates (weekly progress-collection & update, change order variation management, contractor project management)
· Project reporting (issue of internal weekly project status reports and goverment/partner’ external progress report)
· Cost management and control (provide cost control services to project teams to ensure proper project cost management and profitability monitoring using SAP-System Application and Product, Navision, Incontrol and spread sheet).
· Invoice advise reports (verify and approve invoice; advise reports before issuence to finance)
· Familiar with fabrication, construction and Installation for offshore and onshore facilities.
· Familiar with International Codes and Standards.
· Familiar with Construction and Installation for offshore and onshore facilities.
· Capable to coordinate and manage employees in project team according to company organization and company required.
· Ability to assist and advice Project Manager in Project Control scope (Planning/Scheduling and Costing) for Project Execution.

PT AMEC BERCA Indonesia

January 2008 - Present
Multi National Oil and Gas Engineering Consultant
Position: Planning Engineer

Project :

TOTAL TUNU 11 Development project for south and north area (EPSC 3 and EPSC 13),

Responsibilities:
· Prepare Deliverables List based on Work Breakdown Structure (WBS).
· Prepare project control system format, a Master Schedule which will be used for baseline schedule that defines the order and estimated times in which the significant activities and salient features of the project are planned to be completed.
· Develope progress measurement for each activity in the Master Schedule.
· Identify the critical activities by implement of the critical path method for summary level and detailed level and issue agenda/minutes periodically of the critical project milestones.
· Describe reports for project management and control to include description, progress calculation, area of concern in both format weekly and monthly report.
· Manpower load planning.
· Prepare and update project schedule, S-curve and project progress.Prepare project weekly report, showing the progress of project activities and the problems occurred in previous week

Cegelec for TOTAL Indonesie

March 2007 – January 2008
Multi National Oil and Gas Contractor
Position: Planning Engineer and Cost Controller

Project :

TOTAL TUNU 11 Development project for south and north area (EPSC 4 and EPSC 14),covering engineering design, procurement, installation and commissioning.

Project Value: 14,000,000 USD for EPSC 4 and 10,000,000 USD for EPSC 14

Responsibilities:

Planning Engineer :
· Prepare progress measurement procedure and reporting procedure.
· Prepare Engineering, Procurement & Construction Master Schedule Level I to Level IV.
· Prepare progress calculation for engineering, procurement and construction.
· Prepare weekly and monthly report.
· Prepare Project Milestone to be used by vendor.
· Contribute in project meetings discussing project progress and planning need.
· Identify all required resorces to perform projects and assure procedures are being utilized to acquire the the resources.
· Manpower resource loading for S-curve.
· Ensure that schedule changes are input on a timely basis.
· Determine and report project status and updating of schedule document as required and distribute to management.

Cost Contror Engineer :
· Prepare invoicing procedure.
· Prepare invoice based on progress achieved.
· Prepare Detail Work Statement and Work Statement for invoicing.
· Monitor, analyze and make a recommendation for any cost changing during project execution.
· Prepare cost report for management and Company.
· Monitor project cost expense, cash flow and payment to vendor.

China National Oil Offshore Company (CNOOC) SES Ltd

Nov 2005 – March 2007
Multi National Oil and Gas Company
Position: Planning Engineer and Cost Engineer


Project :
Sumatera (SES) Gas Development Project, covering engineering design, study facilities, construction of the 3 jackets and 3 topside, 165 km subsea pipeline, wellhead and production facilities, flare tripod with tower and brige connecting of two platforms, Gas Metering Station at Ciliegon and Pabelokan Onshore Gas Plant facilities.

Project Value: 202,582,362 USD

Responsibilities:
· Prepare Engineering, Procurement & Construction Master Schedule Level I to Level IV.
· Prepare Project Milestone to be used by contractor.
· Monitor progress activities during contract execution and high-lighting availability.
· Coordinate with contractor for material/equipment ETA date and material availability.
· Contribute in project meetings discussing project progress and planning need.
· Participate in project progress review meetings and coordinates with counterpart in concern services.
· Coordinate with respective contract engineer on the day to day running of the contract term of progress, delays and cost associated with the work.
· Identify all required resorces to perform projects and assure procedures are being utilized to acquire the the resources.
· Manpower resource loading for S-curve.
· Ensure that schedule changes are input on a timely basis.
· Determine and report project status and updating of schedule document as required and distribute to management.
· Daily monitoring on Jacket-Topside fabrication, offhore hook up and installation, onshore construction, installation and commissioning.
· Project cost estimation and budgeting.
· Prepare and process of AFE proposal to get approval from BPMIGAS.
· Prepare project reports and presentation for management, corporate partners and BPMIGAS (government).
· Prepare project management procedures (change order procedure, progress measurement procedure, reporting procedure, project payment procedure, etc.)
· Monitor, analyze and make a recommendation for any cost and schedule changing during project execution.
· Involve in provision of project support services.
· Involve in materials and equipment provision, including procurement, importation, formalities and certification.Prepare close-out report of project AFEs for BPMIGAS